Mining
Indiabulls has been awarded the Bhaiyathan Power Project by Chhattisgarh State Electricity Board (“CSEB”). The captive coal mines have geological reserve of approximately 349.51 Million Metric Tonnes based on geological survey by Central Mine Planning and Design Institute Ltd. The Ministry of Coal, Government of India has allocated captive coal blocks located in Gidhmuri and Paturia villages of district Korba in the State of Chhattisgarh for the Bhaiyathan Project.
The Geo-technical Studies, Geological Report & the Mine Plan have already been prepared. The process of land acquisition for the rail corridor has been initiated through Chhattisgarh State Power Generation Company Limited (successor of CSEB). |